24-S-08 DBH Olive Ave Roof Replacement and Façade Repairs
Results
This project is anticipated to award on December 17, 2024.
A bid opening for this project was held on October 31, 2024 on Zoom.
24-S-08-Bid-Summary.pdf(PDF, 201KB) corrected version posted 11/8/2024
Everyone who has expressed interest in this project is available on the Planholders List(PDF, 270KB) (updated frequently).
Description
The work to be done, in general, consists of replacing the existing roof and repairing the existing exterior brick wall facade and concrete tilt-up panels of the Department of Behavioral Health building, covering approximately 115,000 square feet, located at 5555 E. Olive Avenue, Fresno, CA, 93727.
The architect's estimate range is $5,500,000 to $6,100,000.
Location Map(PDF, 1MB)
Specifications and Plans
Notice to Bidders(PDF, 126KB) posted 10/1/2024
Project Manual(PDF, 4MB) posted 10/1/2024
Plans(PDF, 22MB) (22 MB) posted 10/1/2024
Addendum 1(PDF, 306KB) posted 10/25/2024
Plans - Addendum 1(PDF, 13MB) (13 MB) posted 10/25/2024
Supplemental Information
Requests for Clarification Responses updated 10/28/2024
Asbestos Bulk Sample Report(PDF, 2MB) posted 10/16/2024
As-Built Drawings(PDF, 174MB) (180 MB) posted 10/25/2024
Architectural Supplemental Instructions ASI B01(PDF, 2MB) posted 10/28/2024
Pre-bid Meeting
A pre-bid conference was held on Tuesday, October 15 at 10:00 a.m. Pacific at the project site.
Pre-Bid Conference Agenda(PDF, 364KB) posted 10/14/24
Pre-Bid Conference Attendance(PDF, 2MB) posted 10/16/2024
Pre-Bid Conference Minutes(PDF, 226KB) posted 10/16/2024