24-07-C East Reedley Bridge Replacements

Sign Up for Project Updates

Receive notifications (addenda, bidding logistical updates, etc.) for this project by filling out a Request to be Added to the Planholders.

Everyone who has expressed interest in this project is available on the Planholders List(PDF, 261KB) (updated frequently).

Description

The work to be done consists, in general, of removing and replacing three structurally deficient bridges: the Reedley Main Canal Bridge on Englehart Avenue, 0.04 miles north of American Avenue; the Travers Creek Bridge on Lincoln Avenue, 0.55 miles east of Alta Avenue; and the Travers Creek Bridge on Parlier Avenue, 0.52 miles west of Alta Avenue. Full street closure will be required for the construction of each of the three bridges, and a detour will be provided. In channel work will commence after the Alta Irrigation District’s irrigation season in August or September of 2024.

The Reedley Main Canal Bridge on Englehart Avenue will be replaced by a bridge with a width of 35 feet and a length of 37 feet. The existing bridge structure will be replaced with a two-span cast-in-place concrete box culvert. The work also consists of installing concrete bridge barriers, reconstructing the bridge approaches and adding shoulders, cold planing and overlaying existing pavement, constructing driveways, installing crash cushions, and in-channel work. Two trees will be removed.

The Travers Creek Bridge on Lincoln Avenue will be replaced by a bridge with a width of 63 feet and a length of 24 feet. The existing bridge structure will be replaced with a cast-in-place bottomless concrete box culvert with a foundation of concrete footings. The work also consists of installing concrete bridge barriers, reconstructing bridge approaches and adding shoulders, cold planing and overlaying existing pavement, constructing driveways, installing drainage pipe between the channel and ditch, and installing rock slope protection in the channel. One stump will be removed.

The Travers Creek Bridge on Parlier Avenue will be replaced by a bridge with a width of 49 feet and a length of 29 feet. The existing bridge structure will be replaced with a two-span cast-in-place concrete box culvert. The work also consists of installing concrete bridge barriers, reconstructing bridge approaches and adding shoulders, constructing driveways, installing crash cushions, and installing concrete slope protection and rock slope protection in the channel. Approximately eleven trees will be removed.

The engineer's estimate range is $4,400,000 to $4,800,000.

Location Map

REEDLEY-MAIN-CANAL-MAP.png

TRAVERS-LINCOLN_LOCATION-MAP.png

TRAVERS-PARLIER_LOCATION-MAP.png

Specifications and Plans

Notice to Bidders(PDF, 138KB) posted 6/11/2024

Plans(PDF, 21MB) posted 06/21/2024

Specifications(PDF, 19MB) posted 06/21/2024

To be notified when the Plans and Specifications are posted, fill out a Request to be Added to the Planholders.

Supplemental Information

Requests for Clarification Responses updated 6/26/2024

Cross sections(PDF, 1MB) posted 6/26/2024

Bid on this Project

We encourage you to submit an electronic bid for this project. The Specifications describe how you can bid using the old paper process.

All bids are due before Thursday, July 11, 2024 at 2:00 p.m. Pacific

Bid Opening and Results

Bids will be bid opened for this project:

Thursday, July 11, 2024 at 2:00 p.m. Pacific

Questions

Ask a question about this project by submitting a Request for Clarification

Review responses to previously asked questions