Results
20-11-J was awarded on 6/8/2021 to Ardent General
20-12-J was awarded on 6/8/2021 to Avison Construction
20-21-J was awarded on 6/8/2021 to Emmett's Excavation
20-23-J was awarded on 6/8/2021 to Eslick Construction
The bid opening for this project was held at 2:00 p.m. on May 28, 2021 on Zoom.
Bid Summary(PDF, 217KB)
Everyone who expressed interest in this project is listed on the Planholders List(PDF, 260KB).
Description
A Job Order Contract is an indefinite quantity contract pursuant to which the Contractor will perform an ongoing series of individual projects at different locations throughout the County of Fresno. The types of work to done may include, but is not limited to: concrete repair, culvert repair, guardrail replacement, bridge removal, bridge wing wall repair, irrigation pipe replacement, repair of failed roadway sections, repair of asphalt dike, and minor road or parking lot repairs. Work being contemplated under this Job Order Contract includes potentially Federally-funded work associated with a declared disaster (DR-4569-CA) over which the Federal Emergency Management Agency would have oversight. The bid documents include a Construction Task Catalog® containing construction tasks with preset Unit Prices. All Unit Prices are based on local labor prevailing wages, material and equipment prices and are for the direct cost of construction.
Specifications and Plans
Notice to Bidders(PDF, 105KB)
Specifications(PDF, 2MB)
The Construction Task Catalog® has been distributed to planholders.
Addendum 1(PDF, 772KB)
Addendum 2(PDF, 255KB)
Addendum 3(PDF, 437KB)
Supplemental Information
Requests for Clarification Responses
Pre-bid Meeting
A mandatory pre-bid conference was held on:
May 12, 2021 at 10:00 AM Pacific on Zoom
Pre-Bid Conference Agenda(PDF, 175KB)
Pre-Bid Conference Attendees(PDF, 89KB)
Pre-Bid Conference Slides(PDF, 1MB)(PDF, 1MB)
Pre-Bid Conference Notes(PDF, 206KB)(PDF, 206KB)