Accolades and Awards
- 2021 Outstanding Bridge Award – American Society of Civil Engineers, San Francisco Section
- 2020 Efficient and Sustainable Bridge Maintenance Award - County Engineers Association of California
- 2020 Construction and Reconstruction Projects Honorable Mention - County Engineers Association of California
Bidding Results
18-23-C was awarded to American Paving Company on July 9, 2019.
The bid opening for this project was held on June 6, 2019.
Bid Summary(PDF, 114KB)
Everyone who expressed interest in this project is listed on the Planholders List(PDF, 26KB)
Description
The work to be done consists, in general, of replacing the existing one-lane Italian Bar Road Bridge over the San Joaquin River/Redinger Lake with a new two-lane bridge. The project would construct a new two-lane bridge approximately 27 feet downstream of the existing bridge centerline, improve and realign approach roads, and temporarily strengthen the Whiskey Creek Tributary Bridge in Madera County to facilitate construction equipment access to the site. Clearing and grubbing is to be performed and the roadway is to be finished. The existing Italian Bar Road Bridge would function as an onsite detour during construction and would be removed after project completion.
The engineer's estimate range is $4,871,280 to $5,384,060.
Location Map(PDF, 333KB)
(PDF, 333KB)
Specifications & Plans
Notice To Bidders(PDF, 120KB)
(PDF, 120KB)Specifications(PDF, 37MB)
(PDF, 37MB)LSSA Notification No. 1600-2017-0174-R4 for Whiskey Creek Tributary Bridge(PDF, 31MB)
Other project permits are found in the Project Details section of the Specifications.
Plans 11268(PDF, 20MB)
Addendum#1 and Supplemental Information(PDF, 1MB)
Addendum #2 and Supplemental Information(PDF, 14MB)
Addendum#3 and Supplemental Information(PDF, 2MB)
Addendum#4 and Supplemental Information (PDF, 1MB)
Addendum#5(PDF, 451KB)
Addendum#6 and Supplemental Information(PDF, 701KB)
Supplemental Information
Foundation Report(PDF, 10MB)
(PDF, 10MB)Addendum to Foundation Report(PDF, 892KB)
(PDF, 892KB)As-Built Plans(PDF, 1MB)
(PDF, 1MB)Bridge Inspection Report - 05-11-2018(PDF, 3MB)
(PDF, 3MB)Cross Sections(PDF, 3MB)
(PDF, 3MB)MTDC Portable Vehicle Washer(PDF, 781KB)
(PDF, 781KB)Report of Limited Asbestos-Containing Materials, Lead Paint, and Aerially Deposited Lead Surveys(PDF, 4MB)
(PDF, 4MB)Bridge Inspection Report - Fracture Critical - 07-19-2017(PDF, 2MB)
(PDF, 2MB)Italian Bar Low Water Photos(PDF, 2MB)
(PDF, 2MB)Italian Bar Type Selection Report(PDF, 12MB)
Bridge Inspection Report - 41C0021(PDF, 497KB)
(PDF, 497KB)Bridge Inspection Report - 41C0022(PDF, 725KB)
Bridge Inspection Report - 41C0054(PDF, 396KB)
(PDF, 396KB)Bridge Inspection Report - 42C0264(PDF, 2MB)
Pre-Bid Meeting
A non-mandatory pre-bid meeting was held at 11 a.m. on Wednesday, April 24, 2019.
(PDF, 1MB)
Pre-Bid Meeting Attendees(PDF, 1MB)
Pre-bid Agenda(PDF, 25KB)
(PDF, 25KB)Pre-bid Information Sheet(PDF, 23KB)