Request for Clarification Responses
East Reedley Bridge Replacements
Supplemental Information - Not Part of the Contract Documents
The following list is comprised of paraphrased Requests for Clarification (RFC) submitted by potential bidders or sub-bidders in writing via email, letter, and this form:
24-07-C Request for Clarification Form
Drawing No. CD-2, CD-3 AND CD-5
Can existing topographic grades or cross sections be provided to perform accurate earthwork take off? (RFC 2407-2 submitted 6/25/2024)
The Channel Cross Sections are posted on the project website under "Supplemental Information". Response date: 06/26/2024
Please provide Builder’s All-Risk Requirements as there are no details included in the specifications. However, there is a separate line item for Builder’s All-Risk Insurance for each location within the Bid. (RFC 2707-3 submitted 7/1/2024)
See Addendum 1. Response date: 07/02/2024
Area as-built plans available for each project location? (RFC 2707-4 submitted 7/3/2024)
As-Built Plans for Reedley Main Canal and Travers Creek Parlier have been posted to the website under Supplemental Information. As-Builts for Travers Creek Lincoln are unavailable. Response date: 07/03/2024
Specification No. 2-1.06B Supplemental Project Information
Section 2-1.06B Supplemental Project Information states there are documents available on the Design Services webpage. However, after a search of the webpage we have been unable to locate the documents. Please provide these documents for bidder's use. (RFC 2707-6 submitted 7/3/2024)
Hydraulic/Geotechnical Reports and Environmental Permits have been posted to the website under Supplemental Information. Response date: 07/03/2024