23-29-C CSA 1 Tamarack Water Infrastructure Replacement

Results

This project is anticipated to come before the board on June 18, 2024 July 09, 2024.

A bid opening for this project was held on May 2, 2024 on Zoom.

Bid Summary(PDF, 116KB)

Everyone who has expressed interest in this project is available on the Planholders List(PDF, 263KB).

Description

The work to be done consists, in general, of installing approximately 3,900 feet of High-Density Polyethylene (HDPE) water main along with the necessary appurtenances, replacing the function of the existing asbestos cement pipelines. The project also includes installing approximately 45 service connections with meters and meter boxes and installing five fire hydrants. This project contains additives including removing the existing storage tank, installing a new storage tank with other necessary appurtenances, installing an access road to the new tank, and installing pavement overlays in the project area.

The engineer's estimate range is $1,700,000 to $1,800,000.

Location Map(PDF, 258KB)

Vicinity-Map-CSA-1.png

Specifications and Plans

Notice to Bidders(PDF, 171KB) posted 4/02/2024

Plans(PDF, 11MB) posted 4/05/2024

Specifications(PDF, 12MB) posted 4/05/2024

Addendum 1(PDF, 2MB) posted 4/26/2024 updated version with signature. no other changes 4/30/2024

Supplemental Information

Requests for Clarification Responses updated 4/26/2024

Pre-Bid Meeting

A pre-bid conference was held on April 16, 2024 at 10:00 a.m. Pacific Time on Zoom 

Pre-Bid Conference Agenda(PDF, 163KB)

Pre-Bid Conference Attendance(PDF, 373KB)

Pre-Bid Conference Notes(PDF, 279KB)