Request for Clarification Responses
County Service Area 44C Water Facility Improvements
Supplemental Information - Not Part of the Contract Documents
The following list is comprised of paraphrased Requests for Clarification (RFC) submitted by potential bidders or sub-bidders in writing via email, letter, and this form:
23-28-C CSA 44C Request for Clarification Form
Are contractors responsible for the disposal of chlorinated water? How would it need to be disposed? (RFC 2328-1 submitted 3/22/2024)
See Specifications Section 101-1.02-J Response date: 03/25/2024
What is the timeline for this project? (RFC 2328-2 submitted 3/22/2024)
See Specifications Section 8-1.04C. Response date: 03/25/2024
Is there tracer wire for the underground components? (RFC 2328-3 submitted 3/22/2024)
There may be tracer wire for site piping. Its condition is unknown. The Contractor is responsible for potholing and verifying the location of all existing underground facilities within the project area. Response date: 03/25/2024
Where would the temporary water system be located? (RFC 2328-4 submitted 3/22/2024)
All equipment, temporary or permanent, shall be located within the fenced distribution site. Response date: 03/25/2024
Is there a preferred material for the piping? (RFC 2328-5 submitted 3/22/2024)
Refer to sheet 4 of the Plans and Section 100-1.02 of the Specifications. Response date: 03/25/2024
Will the tank system need to have a vault? (RFC 2328-6 submitted 3/22/2024)
The storage tank fill will have saddle taps for chlorine injection. The chlorine line is installed via trenched carrier pipe from the Operator shed. Response date: 03/25/2024