22-05-C Dry Creek Bridge Replacement on Burrough Valley Road

Results

22-05-C was awarded on March 28, 2023 to Agee Construction Corporation.
 
Bid Summary(PDF, 239KB)

Everyone who expressed interest in this project is available on the Planholders List(PDF, 260KB).

Description

The work to be done consists, in general, of the replacement of the Dry Creek Bridge and box culvert on Burrough Valley Road, south of the community of Tollhouse and approximately 25 miles northeast of the City of Fresno. The existing bridge would be removed to accommodate a replacement structure measuring 35 feet 6 inches wide by 114 feet long; the replacement structure would accommodate two 12-foot-wide traffic lanes, two 4-foot-wide shoulders, and two Type 836 concrete barriers. The replacement culvert would consist of a two cell 6-foot high (4-foot clear) by 12-foot wide (12-foot clear) precast concrete box culvert structure. During construction, traffic on Burrough Valley Road would be maintained through the construction of a temporary creek crossing downstream of the existing bridge. The crossing would be located approximately 110 feet south of the southwestern corner of the existing bridge span, connecting Tollhouse Road to Burrough Valley Road.   

The engineer's estimate range is $4,800,000 to $5,300,000.

Location Map(PNG, 857KB)

Location Map

Specifications and Plans

Notice to Bidders(PDF, 138KB) posted 2/14/2023

Plans (7 MB) posted 2/21/2023

Specifications (47 MB)(PDF, 47MB) posted 2/21/2023

Addendum 1(PDF, 331KB) posted 2/23/2023

Addendum 2(PDF, 371KB)  posted 3/7/2023

Addendum 3(PDF, 515KB)  posted 3/13/2023

Addendum 3 - Plans (7MB)(PDF, 7MB)  posted 3/13/2023

Supplemental Information

Requests for Clarification Responses updated 3/9/2023

Cross Sections(PDF, 1MB)  posted 2/27/2023

Cross Sections - Temporary Detour(PDF, 428KB) posted 3/6/2023

Low Flow Technical Memorandum(PDF, 527KB) posted 3/6/2023

Archival Drawing: Burrough Valley Road ... Toll House Road(PDF, 2MB)  Date: May 17, 19?1 – Provided as-is. Several details do not match the current bridge. No other "as built" files are available. posted 3/8/2023

Foundation Report(PDF, 4MB)  posted 3/8/2023

Restoration Plan(PDF, 19MB)  posted 3/10/2023

Revised Cross Sections(PDF, 2MB)  posted 3/14/2023

Pre-bid Conference

A pre-bid conference was held on February 24, 2023 at 10:00 am Pacific on Zoom.

Pre-Bid Conference Agenda(PDF, 128KB)

Pre-Bid Conference Attendance(PDF, 72KB)

Pre-Bid Conference Minutes(PDF, 187KB)